Kauri Dual Fuel Project

PROJECT: 57 MW Diesel Fuel System. MTL ROLE: MTL was engaged by Fonterra to provide engineering design and project management services for the implementation of a bulk diesel storage and reticulation network. The diesel fuel system provides Fonterra with security of energy supply to the Kauri site and enables production during a gas outage. The [...]

2023-05-04T12:58:03+12:00May 4th, 2023|

Waterview Tunnel Sump Drainage

PROJECT: Design of the pipe supports for the Waterview Tunnel sump drainage system. MTL ROLE: MTL Civil Ltd was engaged by Well-Connected Alliance to provide engineering structural and seismic design services for the pipe supports along the Waterview Tunnel. The drainage system of the tunnel is essential for normal operation of the tunnel and emergency [...]

2019-08-02T15:29:50+12:00August 2nd, 2019|

Waitoa Fire Water Upgrade

PROJECT: Waitoa Dairy Factory Fire Water System Upgrade. MTL ROLE: MTL was engaged by Fonterra to provide engineering services for the upgrade of Waitoa’s fire water pump station and replacement of end of life buried fire water pipework. MTL’s role included the detailed hydraulic analysis, design specification and commissioning for the upgrade works. During the [...]

2019-07-05T17:41:44+12:00July 5th, 2019|

Aluminium Processing Plant

PROJECT: South Island Aluminium Processing Plant. MTL ROLE: MTL was engaged in October 2011 to provide project management and engineering services to Fletcher Aluminium to deliver a new aluminium processing plant in Christchurch. MTL undertook the process and mechanical design for the processing plant including the chemical dosing plant, trade waste treatment plant, automated crane, [...]

2019-07-04T13:46:53+12:00July 4th, 2019|

Golden Bay Cement Silo 9

PROJECT: 6,000 T Cement Silo, Ship & Truck Loading Systems. MTL ROLE: Commissioning Manager (Secondment). PROJECT OUTCOME: The Silo 9 works enables increased cement production at the Portland works by providing a 180 T/h ship loading system to enable faster turnaround of the 8,500 T capacity MV Aotearoa Chief and a fully automated 1,000 T/d [...]

2019-06-27T11:43:43+12:00July 27th, 2018|

Kauri Dairy Factory Boiler Replacement

PROJECT: Kauri Dairy Factory Boiler Replacement. MTL ROLE: MTL was engaged to provide project management and engineering assistance to Fonterra for the upgrade to the Energy Centre at their Kauri Dairy Factory in Northland. MTL’s scope of engagement included: Project and contract management for the demolition of two redundant thermal fluid boilersProject and contract management [...]

2019-06-27T12:14:45+12:00July 19th, 2018|

Bottleswap LPG Bottle Filling Facility

PROJECT: LPG Bottling Plant – 6,000 Bottle/Day processing capacity. MTL ROLE: Vector’s OnGas operated LPG processing plant includes automated bottle emptying, washing, painting and filling operations. MTL was engaged to provide technical leadership for the delivery of the bottle processing and painting facilities. Our services included procurement support, contract administration, coordination of the separate plant [...]

2020-03-16T09:20:58+13:00July 2nd, 2018|