PROJECT:

Two 150m3 Sludge Thickener Balance Tanks.

MTL ROLE:

Watercare required two new in ground sludge balance tanks to be constructed at their Ardmore Water Treatment Plant. The site for the tanks, located on steeply sloping and poor ground, posed significant design challenges.

MTL undertook the detailed design of the reinforced concrete water retaining structures which were supported on reinforced concrete piles taken down to rock.

PROJECT OUTCOME:

MTL managed the design, prepared tender documentation, administered construction, and oversaw construction to a successfull completion of the tanks and related drainage works.

PROJECT PARTNERS:

Watercare, HEB Construction Ltd.