Olkaria 1 Unit 6 Owners Engineer

PROJECT: 70 MW Geothermal Steamfield. MTL ROLE: KenGen are custodians of a significant geothermal resource in the Rift Valley, Kenya. The Olkaria I Unit 6 project will add 70MW to KenGen’s significant geothermal capability. The project aim is to optimise the use of existing, unutilised production wells, minimising project development risks. MTL is performing the [...]

2019-07-05T17:25:36+12:00November 16th, 2016|

Wellhead Piping

Project: Connection of a wellhead into the existing wellhead manifold. MTL Role: MTL carried out the detailed design of the wellhead piping including the civil and structural design of the pipe supports and foundations. The design connected the well via a DN300 line to the existing cross over piping between production systems. Our scope included [...]

2019-07-05T17:25:23+12:00November 16th, 2016|