MTL partnered with MB Century for the process and detail design of this steamfield. The steamfield is to supply steam for the proposed 170MW Te Mihi Power Station, and the existing Wairakei and Poihipi Power Stations.
MTL's role included the system process design, and detailed pump station design for the separated water and condensate reinjection pump stations.
The new steamfield has to complement the existing steamfield system, and provide for a seamless commissioning process.