MTL were involved with this project from the initial engineering estimate and tendering, all the way through to contract management and commissioning. The task involved the installation of sophisticated new drying equipment and modifications to existing plant, with the handicap of very short lead times and tight production windows. The results have been dramatic. Fonterra has enjoyed a marked improvement in the Te Rapa plant’s reliability, leading to increased production.